The operator dossier covers everything an asset team asks for.
- Architectural drawings (DWG + PDF).
- Full materials provenance with chain-of-custody certificates.
- Electrical + structural compliance documentation.
- Installation case studies — referenced where possible.
- The ROI model in spreadsheet form, not a marketing slide.